When you post payable transactions to the Expense range of accounts, Sage 100 Contractor displays the Job Cost Distribution window.
| 1 | In the Job box, enter the job number. | 
| 2 | In the Phase box, enter the phase number. | 
| 3 | In the Date box, enter the transaction date. | 
| 4 | In the Description box, enter a brief statement about the job cost. | 
| 5 | In the Transaction# box, enter the transaction number. | 
| 6 | In the Cost Code box, enter the cost code number using the lookup window, then press Enter. | 
| 7 | In the Cost Type box, select the cost type. | 
| 8 | Repeat steps 1–7 for each item for which you want to create a cost record. | 
| 9 | On the File menu, click Save. | 
Tips:
| 
                         
                              |