About equipment rates for time and materials billing

You can assign a table of equipment rates to a time and materials (T&M) job in the T&M Billing Setup window. Sage 100 Contractor determines the billing amounts using the equipment rate table instead of the equipment costs.

You can set up equipment rates for: