Entering job phases
Note: Job phases, in contrast to bid items, affect estimates and some billing items and follow through the entire job.
To use Phases, you must begin with Phase 1 or higher. Phase 0-None is a place holder if you are not using Phases.
To enter job phases:
|
1
|
Open 3-5 Jobs (Accounts Receivable), and then select the job. |
|
2
|
From the Options menu, select Job Phases. |
|
3
|
On the Job Phases window, in the Phase# column, enter the phase number. |
|
4
|
In the Description column, enter a brief statement about the phase. |
|
5
|
Do any of the following, as required: |
|
a
|
In the Billing Amount column, enter the amount that you want to bill per phase when creating invoices by phase. |
|
b
|
In the Retention column, enter the retention rate for the phase. |
|
c
|
In the Model column, enter the model. |
|
d
|
In the Unit column, enter the unit of measurement. |
|
e
|
In the Quantity column, enter the measurement. |
|
6
|
Repeat steps 3–4 for each phase. |
|
7
|
Repeat step 5 for each phase only as required. |
|
8
|
On the File menu, click Save. |
Tip: Instead of setting a retention rate for the entire job, you can set a separate retention rate for each phase.