Note: This functionality is available only if you have the Estimating Module.
There are five tabs in the 9-5 Takeoffs window:
Each tab provides tools for working with and viewing different aspects of the project’s estimates.
The 9-5 Takeoffs window opens with the Project Values tab in view. You use the Project Values tab to declare the value for project variables, which Sage 100 Contractor then uses throughout the entire takeoff. For example, you might use certain measurements, such as a building’s total square footage or exterior perimeter, in formulas throughout a takeoff.
Use the Takeoff Details tab to set up bid items and phases, followed by enter parts and assemblies into the grid. The columns define the parts and assemblies with Part#, Description, Unit, Quantity, Cost, and more.
Use the buttons at the bottom of the window to break down your takeoff by Bid Items, Phases, Assemblies, Cost Codes, Cost Types, Tasks, Vendors, and Cost Code by Bid Item.
Use this tab to calculate and include costs related to liability, use tax, and bonding.
Use this tab to adjust the bid summary to your business requirements.