Working with 3-Accounts Receivable > 3-10 Time and Materials > 3-10-5 T&M Wage Rates > Entering time and materials wage rates

Entering time and materials wage rates

Consider these the following points when entering time and materials wage rates:

To enter T&M wage rates:

1 Open 3-10-5 T&M Wage Rates.
2 In the Description text box, enter a brief statement about the wage rates table.
3 In the Employee cell, enter the employee number.
4 If you want to assign a cost code to an employee, enter the cost code in the Cost Code cell.
5 In the Rate 1 cell, enter the regular billing rate.
6 In the Rate 2 cell, enter the overtime billing rate.
7 In the Rate 3 cell, enter the premium billing rate.
8 If you want to charge for a minimum number of hours, enter the minimum in the Minimum Hours cell.
9 If an employee works less than the minimum number of hours, Sage 100 Contractor bills for the minimum number of hours.
10 Repeat steps 3–8 for each employee you want to include.
11 On the File menu, click Save.
More resources

For additional online resources for Sage 100 Contractor products, visit the Sage Customer Portal. Use the portal to access the knowledgebase, chat online with customer support, or enter a customer support ticket.

For additional training on Sage products, visit Sage University.