1 | Open 6-10 Unitary Proposals. |
2 | Using the data control, select the job. |
3 | If relevant, in the Phase list, click the phase. |
4 | In a bid list cell, right-click, then click Display Picklist Window. |
5 | Create a Picklist of bid items, and then click the check mark button to insert them into the grid. |
6 | In the grid, do the following: |
a | In the Unit cell, enter the unit of measurement. |
b | In the Quantity cell, enter the quantity of units of work to be performed. |
c | In the Unit Price cell, enter the cost per unit (including the overhead and profit). |
7 | Repeat step 6 for each item. |
8 | On the File menu, click Save. |
Tip: If you anticipate changes and want to preserve the current proposal, set the original proposal.