Working with 9-Estimating (Parts and Assemblies) > 9-5 Takeoffs > About the tabs in 9-5 Takeoffs

About the tabs in 9-5 Takeoffs

Note: This functionality is available only if you have the Estimating Module.

There are five tabs in the 9-5 Takeoffs window:

Each tab provides tools for working with and viewing different aspects of the project’s estimates.

Project Values tab:

The 9-5 Takeoffs window opens with the Project Values tab in view. You use the Project Values tab to declare the value for project variables, which Sage 100 Contractor then uses throughout the entire takeoff. For example, you might use certain measurements, such as a building’s total square footage or exterior perimeter, in formulas throughout a takeoff.

Takeoff Details tab:

Use the Takeoff Details tab to set up bid items and phases, followed by enter parts and assemblies into the grid. The columns define the parts and assemblies with Part#, Description, Unit, Quantity, Cost, and more.

Recaps tab:

Use the buttons at the bottom of the window to break down your takeoff by Bid Items, Phases, Assemblies, Cost Codes, Cost Types, Tasks, Vendors, and Cost Code by Bid Item.

Insurance, Tax and Bonding tab:

Use this tab to calculate and include costs related to liability, use tax, and bonding.

Bid Summary tab:

Use this tab to adjust the bid summary to your business requirements.

Notes:

Links to more information . . .

More resources

For additional online resources for Sage 100 Contractor products, visit the Sage Customer Portal. Use the portal to access the knowledgebase, chat online with customer support, or enter a customer support ticket.

For additional training on Sage products, visit Sage University.