Note: This functionality is available only if you have the Estimating Module.
Note that Sage 100 Contractor updates all bid items in the takeoff with the indicated rates.
| 1 | Open a takeoff in 9-5 Takeoffs. |
| 2 | Next to the Bid Item list, click the detail button. |
| 3 | In the Overhead column, enter the overhead rate for each cost type. |
| 4 | In the Profit column, enter the profit rate for each cost type. |
| 5 | Click Save. |
|
|