Working with 10-Scheduling
>
10-3 Schedules
>
Schedule Views
>
Moving tasks
Moving
tasks
To move a task:
1
Open
10-3 Schedules
.
2
Using the data control, select an existing schedule and click the
Grid/Gantt
button.
3
In the
Mode
menu, select
Move Tasks
.
4
Drag the task to the desired position.
Links to more information...
Resizing tasks in scheduling
About dependencies in scheduling