The rate can be assigned a percentage number or a dollar amount, depending on which Rate Type is selected. If the total percent of net equals 100, a 3-Remainder of check line is not required.
Important! When a line is set to 3-Remainder of check, the Amount/Rate cell is disabled. The remainder of the check will automatically be determined by Sage 100 Contractor and put into the designated account.