When you post payable transactions to the Expense range of accounts, Sage 100 Contractor displays the Job Cost Distribution window.
1 | In the Job box, enter the job number. |
2 | In the Phase box, enter the phase number. |
3 | In the Date box, enter the transaction date. |
4 | In the Description box, enter a brief statement about the job cost. |
5 | In the Transaction# box, enter the transaction number. |
6 | In the Cost Code box, enter the cost code number using the lookup window, then press Enter. |
7 | In the Cost Type box, select the cost type. |
8 | Repeat steps 1–7 for each item for which you want to create a cost record. |
9 | On the File menu, click Save. |
Tips:
|