1 | Open 6-9 Proposals. |
2 | Using the data control, select the job. |
3 | If the job uses phases, in the Phase drop-down list, select the phase. |
4 | Select the Use Cost Codes for proposal lines option. |
5 | In a Cost Code cell, right-click, then click Display Picklist Window. |
6 | Create a Picklist of cost codes, and click the check mark button to insert the list of cost codes into the grid. |
7 | For each cost code, enter the proposed amounts (including the overhead and profit) for each cost type. |
8 | Set the original proposal. |
9 | On the File menu, click Save. |