Working with 9-Estimating (Parts and Assemblies) > 9-5 Takeoffs > Bid Totals > Adjusting bid totals with a bid amount override

Adjusting bid totals with a bid amount override

Note: This functionality is available only if you have the Estimating Module.

You can adjust the bid total with a bid amount override using the Bid Summary tab of the 9-5 Takeoffs window. Using the Bid Amount text box on the Overridden Bid Totals line, you can enter an amount that overrides the values of the entire bid.

Be aware of the following points:

To adjust bid totals with a Bid Amount override:

1 Open 9-5 Takeoffs.
2 Using Takeoff Launch, launch the takeoff that you want to adjust.
3 Click the Bid Summary tab.
4 At the end of the Overridden Bid Totals line in the text box, enter a value.
5 When you have entered a value, Sage 100 Contractor automatically selects the Lock Bid Amount check box.